...more significant projects in the past years are:

gallery/2017
gallery/ford-logo-2
gallery/fori
gallery/img-20170505-wa0003
gallery/img-20170510-wa0002_resized_20170510_124139122
FORD SAARLOUIS - GERMANY-
gallery/2018

JAGUAR LAND ROVER - NITRA - SLOVAKIA-

gallery/jaguar-land-rover_logo
gallery/img_5384
gallery/img_6035
gallery/img_6033
gallery/img_6025

Turn key project to modify station OP070 at the marriage line of the Assembly plant for the Jaguar Land Rover Facilities at Nitra, Slovakia.

 

Including project management, engineerings, assembly, installation and commissioning to achieve a new pitch at the stationOP070 of the marriage line.

 

gallery/ford-logo-2
JAGUAR LAND ROVER
FORD MOTOR COMPANY
FORI AUTOMATION
gallery/fori
VISIA SOLUTIONS
MONTAJES ARRIBAS
gallery/crane
gallery/img_0948
gallery/img_0949
gallery/img_6752

FORD VALENCIA - SPAIN-

Turn key project to deliver a crane system capable of 10Tm and a free length of 12m. with only one rail. Suitable to lift Rail guided vehicles up to 10 Tm. 

 

Project management, mechanical engineering, structural calculation, electrical drawings, certification, assembly and comissionning for the Crane deliver and installation., in the assembly plant of Ford at Almussafes, Valencias. 

 

Synchro area levelling check to ensure a perfect match at the marriage line between the overhead conveyor and flor RGV vehicles at the Assembly plant in Ford Saarlouis, Germany.

 

Exchanging all bolst of the track system and adjusting the guiding rail and level system at the maintenancen area for the optimal path of the Rail guided vehicles..

 