...more significant projects in the past years are:
Turn key project to modify station OP070 at the marriage line of the Assembly plant for the Jaguar Land Rover Facilities at Nitra, Slovakia.
Including project management, engineerings, assembly, installation and commissioning to achieve a new pitch at the stationOP070 of the marriage line.
Turn key project to deliver a crane system capable of 10Tm and a free length of 12m. with only one rail. Suitable to lift Rail guided vehicles up to 10 Tm.
Project management, mechanical engineering, structural calculation, electrical drawings, certification, assembly and comissionning for the Crane deliver and installation., in the assembly plant of Ford at Almussafes, Valencias.
Synchro area levelling check to ensure a perfect match at the marriage line between the overhead conveyor and flor RGV vehicles at the Assembly plant in Ford Saarlouis, Germany.
Exchanging all bolst of the track system and adjusting the guiding rail and level system at the maintenancen area for the optimal path of the Rail guided vehicles..